The BMP training videos are clips from previous Protect Our Water Conference sessions. View the full sessions on the Stormwaterhawaii YouTube page.
Site Management BMPs
SM-2 Material Storage and Handling
- How to Properly Handle and Store Materials
- Hazardous Materials and Waste Management
- Rebar Management
SM-3 Stockpile Management
- Stockpile Management
- Stockpile Management (2023)
- Stockpile Requirement and Management Tips
- Inspection of Stockpiles
SM-4 Concrete Wash and Waste Management
- Concrete Wash and Waste Management Information and Examples
- Examples of Good and Bad Concrete Wash and Waste Management Practices
- Concrete/Asphalt Waste Management
- Concrete Wash and Waste Management (2023)
SM-5 Asphalt Cement Waste Management
- Asphalt Cement/Cold Patch Waste and Stockpile Management
- Waste Asphalt/Cold Patch Stockpile Management
- Waste Asphalt and Cold Planed Material BMPs for Paving Projects
SM-6 Solid Waste Management
SM-7 Sanitary Waste Management
SM-8 Contaminated Soil Management
- Pre-Construction Identification of Contaminated Soil and Groundwater
- Identification and Management of Contaminated Soil
- Contaminated Soil Management – Soil Sampling
SM-9 Hazardous Materials and Waste Management
- Hazardous Materials and Waste Management
- Hazardous Materials and Waste Management (2023)
- Hazardous Material Management
SM-10 Spill Prevention and Control
- Spill Prevention and Control
- Inspection of Drip Protection
- Drip Protection for Construction Vehicles and Equipment
- Drip Protection for Paving Projects
SM-12 Vehicle and Equipment Maintenance
SM-16 Staging Area
- Staging Areas (2023)
- Staging Area Requirements and Examples
- Staging Area Perimeter Control vs. Stockpile Perimeter Control
- SWPPPs and Staging Area/BMP Placement Requirements
- Staging Areas for Paving Projects
SM-17 Preservation of Existing Vegetation
SM-19 Dust Control
Construction Water Deficiencies
Paving BMPs
Erosion Control BMPs
EC-3 Run-on Diversion
EC-4 Slope Roughening, Terracing, and Rounding
EC-7 Slope Drains and Subsurface Drains
EC-8 Outlet Protection and Velocity Dissipation Devices
EC-9 Slope Interceptor or Diversion Ditches/Berms
EC-11 Geotextiles and Mats
EC-12 Seeding and Planting
EC-15 Hydromulching
EC-16 Soil Binders
Sediment Control BMPs
SC-1 Storm Drain Inlet Protection
- Types and Costs of Inlet Protection BMPs
- Common Inlet Protection Deficiencies
- Pulling of Inlet Protection Due to Expected Rain Event
- Inspection of Storm Drain Inlet Protection
- BMPs that Minimized Sediment Discharges
- Inlet Protection Methods
- Inlet Protection for Paving Projects
SC-2 Vegetated Filter Strips and Buffers
SC-4 Sediment Trap
SC-5 Sediment Basin
SC-6 Compost Filter Berm/Sock
- Wattles, Fiber Rolls, and Compost Filter Socks
- Compost Type and Size for Compost Filter Socks
- Compost Filter Sock as a Biofilter
- Perimeter Control Information
- Additional Perimeter Control Information
- Types and Costs of Perimeter Control BMPs
SC-7 Silt Fence or Filter Fabric Fence
- Perimeter Control BMPs: Silt Fence
- Perimeter Control Information
- Additional Perimeter Control Information
- BMPs that Minimize Sediment Discharges
SC-10 Construction Roads and Parking Area Stabilization
SC-11 Stabilized Construction Entrance/Exit
- Types and Costs of Construction Entrances/Exits
- Stabilized Construction Entrance/Exit Information
- Additional Stabilized Construction Entrance/Exit Information
- Inspection of Stabilized Construction Entrance/Exit
- Construction Entrances for Paving Projects
- Stabilized Construction Entrance and Exit (2023)
Miscellaneous
USACE
- USACE Main Authorities to Issue Permits
- USACE Jurisdiction for Permits
- USACE Types of Permits
- USACE Permit Review Process
- USACE Permitted Stormwater Activities
- Activities that Do Not Require Permits and Permit Exemptions
- Keys to a Good USACE Permit Application
NPDES
- NPDES General Permit Information
- NPDES Permit Requirements
- NPDES Appendix F – Hydrotesting Waters Information
- NPDES Appendix G – Construction Activity Dewatering Information
- NPDES Permit Program (2023)
- Proposed Revisions to the HAR Chapter 11-55 Appendix C: Construction General Permit (2023)
- Renewal of CGP Coverage Scenarios (2023)
DOH
- DOH Inspections and Enforcement Statistics
- DOH Enforcement Priorities, Inspection Frequency, and Inspection Process
- Changes to DOH E-Signature Requirements
- DOH Transmittal Letter Tips
- Construction Activities and Contaminated Media – DOH HEER
HDOT
Bridge Work
Communication

