Post Conference Questionnaire

2024 Protect Our Water Questionnaire
1. NPDES is an abbreviation of:
2. Storm water runoff normally discharges through the storm drain system and does not receive treatment before emptying into receiving waterbodies.
3. A construction project that disturbs ___ acre or more of land, or for projects that disturb less than ___ acre of land that are part of a larger common plan of development that will disturb ___ acre or more of land, is required to have construction storm water coverage from a NPDES permit.
4. Select all that apply. A Storm Water Pollution Prevention Plan (SWPPP):
5. Sediment control BMPs are more effective for minimizing pollutant discharges than erosion control BMPs.
6. Storm drain inlet protection and perimeter controls are examples of what types of BMPs?
7. Sediment/debris should be removed when it accumulates to ___ the height or depth of the storm drain inlet protection BMP.
8. Hazardous materials and waste should be:
9. Which of the following is not a requirement for rebar and galvanized metal storage?
10. Choose all of the following that are required when vegetatively stabilizing disturbed areas:

Visit our 2024 Protect Our Water Conference Recap Hub for photos, highlights, and more!