Post Conference Questionnaire 2024 Protect Our Water Questionnaire Email Address * 1. NPDES is an abbreviation of: * a. National Policy for Discharge of Erosion and Sediment b. Natural Protection of Developed Erosion Sites c. National Pollution Disturbed Ecosystem Site d. National Pollutant Discharge Elimination System 2. Storm water runoff normally discharges through the storm drain system and does not receive treatment before emptying into receiving waterbodies. * True False 3. A construction project that disturbs ___ acre or more of land, or for projects that disturb less than ___ acre of land that are part of a larger common plan of development that will disturb ___ acre or more of land, is required to have construction storm water coverage from a NPDES permit. * 1 2 3 4 4. Select all that apply. A Storm Water Pollution Prevention Plan (SWPPP): * a. Is required to obtain an NPDES Permit. b. Identifies the plans, procedures, and best management practices used to prevent storm water pollution. c. Is not required to be updated/amended after it is created. d. Is a site-specific document. 5. Sediment control BMPs are more effective for minimizing pollutant discharges than erosion control BMPs. * True False 6. Storm drain inlet protection and perimeter controls are examples of what types of BMPs? * a. Erosion control BMPs b. Sediment control BMPs c. Site Management BMPs 7. Sediment/debris should be removed when it accumulates to ___ the height or depth of the storm drain inlet protection BMP. * a. One-fourth (1/4) b. One-third (1/3) c. One-half (1/2) 8. Hazardous materials and waste should be: * a. Stored in secondary containment that is able to retain 100% of the volume of the largest container or 10% of the aggregate total of all the containers being stored within the secondary containment. b. Stored under a covered facility or be covered by an impermeable material like plastic sheeting. c. Labeled with their original product label if stored in a container. d. All of the above 9. Which of the following is not a requirement for rebar and galvanized metal storage? * a. Surround rebar with perimeter control. b. Rack rebar off the ground and on proper dunnage, pallet, or similar material. c. Cover rebar with impermeable material. 10. Choose all of the following that are required when vegetatively stabilizing disturbed areas: * a. Initiate soil stabilization measures immediately whenever earth-disturbing activities have permanently or will/has temporarily ceased for 14 or more calendar days. b. Establish uniform (evenly distributed without large bare areas), non-invasive, perennial vegetation, which provides 70% of the coverage that was provided by vegetation prior to commencing earth-disturbing activities. c. Not be checked frequently to identify areas where vegetation is not establishing well. d. Install/keep perimeter controls and inlet protection around revegetating areas until it has become vegetatively stabilized. e. Remove sediment controls before approval from the Engineer deeming disturbed areas has been vegetatively stabilized. Submit If you are human, leave this field blank. Visit our 2024 Protect Our Water Conference Recap Hub for photos, highlights, and more!