Description
Devices placed at the inlet or outlet of pipes and channels to enhance hydraulic operation while minimizing scour and erosion.
Applications
- Flared culvert end sections may be placed at inlets and outlets of slope drains and culverts.
Installation and Implementation Requirements
- Construct on level ground where possible. Flatter slopes reduce the potential of erosion and scour.
- Supplement with additional outlet protection devices.
- Protect the transition to the flared end section at inlets to prevent scouring.
- Extend additional rip-rap downstream of outlet to reach stable conditions and minimize scouring. Ensure geotextile filter fabric is installed under rip-rap.
- All disturbed areas must be immediately stabilized with native vegetation once construction is complete.
- Monitor accumulation of debris and sediment and remove within 60 days of notification. Immediately clean culverts located where Class AA or Class 1 waters or highway safety may be adversely affected. Refer to Hawaii Administrative Rules (HAR) Title 11, Chapter 54 for state waters classification.
- Obtain guidance from the District Maintenance Engineer or Highways Hydraulic Section and refer to Highways Standard Plans.
Considerations
- Limited use as an erosion control measure. Primarily used to increase hydraulic efficiency.
- Improperly designed culverts could result in erosion, scouring, or ponding.
- Pipes can clog if they are not adequately protected from litter.
- Pipe outlets may cause critical levels of erosion if devices are not installed to dissipate the velocity of storm water flow.
- Additional erosion control BMPs will need to be added to slope drains on slopes greater than 10%, due to highly erosive velocities.
- The contractor may need to temporarily remove rip-rap to repair/replace geotextile filter fabric under rip-rap.
What to Inspect
- Is flared culvert end section installed correctly, per manufacturer’s specifications?
- Is there evidence of scour around and beneath flared culvert end sections?
- Is there a non-storm water discharge observed from pipes?
- Is ponding occurring in traffic lanes or private property?
- Is geotextile filter fabric installed under rip-rap?
Maintenance
- Remove accumulated sediment from inlets, outlets, and rip-rap.
- Refresh rip-rap that has been dislodged.
- Add additional BMPs if erosion and scouring are observed.
- Repair geotextile filter fabric that has rips and/or tears.
- Remove temporary BMPs when drainage area is stabilized and construction is complete.

BMP Examples
Are adequate BMPs installed to prevent the discharge of pollutants from the project site? Hover over each photo for an explanation of the situation presented and if BMPs have been installed properly.