Description
TrainingTraining to be administered annually through the Protect Our Water Conference. programs that address the proper installation and maintenance of construction best management practices (BMPs), along with State of Hawaii Department of Transportation (HDOT), Highways policies, rules, and procedures regarding construction storm water.
TRAINING OBJECTIVES
Provide the necessary information for personnel to identify potential pollutant sources on DOT-HWYS construction projects and implement practicable solutions.
Applications
- Personnel with construction storm water responsibilities, including but not limited to designers, construction engineers, construction and maintenance inspectors, plan reviewers, contractors, and sub-contractors are responsible, as applicable, for the following:
- Designing, installing, maintaining, and/or repairing storm water controls/BMPs (including pollution prevention measures).
- Applying and storing chemicals.
- Vehicle/equipment storage, maintenance, and refueling.
- Conducting inspections.
- Taking and documenting corrective actions.
Installation and Implementation Requirements
- Provide training to DOT-HWYS staff with construction storm water responsibilities, including construction engineers, construction and maintenance inspectors, and plan reviewers. Per MS4 NPDES Permit No. HI S000001, as in effect, training shall be specific to DOT-HWYS activities (including the proper installation and maintenance of accepted BMPs), policies, rules, and procedures.
- Provide relevant educational materials to project applicants, contractors, developers, property owners, and other responsible parties, per MS4 NPDES Permit No. HI S000001, as in effect.
- Provide construction BMP training to contractors and sub-contractors responsible for development of the Storm Water Pollution Prevention Plan (SWPPP) and implementation of site-specific BMPs on DOT-HWYS contract construction projects. The contractor shall keep training logs updated and readily available, per 2005 Hawaii Standard Specifications for Road and Bridge Construction, Standard Specifications & Special Provisions Section 209.03(G), as in effect.
- Prior to commencement of earth-disturbing activities or pollutant-generating activities, whichever occurs first, at a minimum, personnel must be trained to understand the scope of their job duties, as applicable, as follows:
- Location of all storm water controls on the site, and how they are to be maintained.
- Proper procedures to follow with respect to the project’s pollution prevention requirements.
- When and how to conduct inspections, record applicable findings, and take corrective actions.
- Prior to commencement of earth-disturbing activities or pollutant-generating activities, whichever occurs first, at a minimum, personnel must be trained to understand the scope of their job duties, as applicable, as follows:
- Provide storm water training through field office trainings, product demonstrations, an annual storm water conference, videos, newsletters, and/or field demonstrations.
Considerations
- Availability of personnel with storm water responsibilities to attend trainings.
- Motivation and incentive for personnel to learn about erosion and sediment controls.
Training Frequency
- DOT-HWYS provides annual training to staff with construction storm water responsibilities.
- When needed, as new technology, permits, and regulations are created.
- Prior to the commencement of earth-disturbing activities or pollutant-generating activities.
- Provide training to new hires prior to them performing responsibilities related to compliance with applicable permits.
- Site-specific training may be necessary for new construction projects.